A Brief History of the Castec Shoring Wall System
April 13, 2023Many concrete structures are built and integrated into buildings and properties due to their accompanying benefits.
One of the benefits of concrete structures is they tend to last for a long time. With the help of professional contractors, these structures are expected to last for numerous years since their concrete materials have been prepared and mixed optimally. Proper installation of the concrete elements can then ensure that their surfaces will not get damaged by outdoor and weather elements easily. Property owners can subsequently maintain the concrete structures conveniently by cleaning and sealing them regularly.
But concrete structures can consume too many resources, especially during their installation. With traditional methods of construction, contractors would often require 10 to 45 days just to complete everything.
Castec Shoring Wall System Changes Everything
Thankfully, the con of constructing concrete structures, particularly retaining walls, has been remedied through the formation of the Castec Shoring Wall System. This system, which relies on Castec Trenching Arm, was developed over 30 years. It is a piece of technology that can excavate the ground and continually cast concrete retaining walls around 300mm thick. It can likewise reach a depth of 6 metres.
The capability of the Castec Trenching Arm allows contractors to save a lot of time, cutting the construction time of concrete retaining walls to just 3 to 4 days as opposed to 10 to 45 days for other construction systems.
Many benefits can be associated with Castec Shoring Wall System. First, it is precise. It can be cast in situ within 50mm of adjoining property boundaries, all without generating vibration. It can then minimise plant time onsite compared with other systems that can take weeks to conclude. The less preparation time and cost for the construction of concrete walls then make Castec Shoring Wall System cost-effective.
Development of the Castec Shoring Wall System
Castec Shoring Wall System has come a long way before it has been integrated into major construction projects in Australia. In 1987, Brian Carpenter, the founder of Castec, was given a new idea for a method of constructing shoring walls for car park basements. While working as a developer in Double Bay at the time, he saw the potential for the concept and set about creating it. The industry pundits may have dismissed the concept as not practical, but Brian’s strong dedication to reaching the end game pushed him to continue.
In 1989, the technology during its infancy was sent to the United States so it can be explored further with a subcontractor of Caterpillar. After eight years of considerable investment, Brian brought the technology back to Australia and tested it for another two years before launching it in 1999. Over the next decade, Brian would utilise the original machine on various concreting projects before selling the company.
Brian then set about developing a different version of the technology. So, in 2008, he worked alongside mechanical and hydraulic engineers to develop the Castec Shoring Wall System. This machine is known to be the fastest, lightest, and most adaptable shoring tool here in Australia as it can excavate and cast concrete simultaneously without any issues.